Prepare for Capital Beltway closures at I-66 in Dunn Loring this weekend

A portion of I-495 South, also known as the Capital Beltway Outer Loop, will be fully closed during overnight hours starting tomorrow (Oct. 8) so construction crews can continue installing overhead bridge beams at the I-66 interchange in Dunn Loring.

The closure will extend to the I-66 West ramp to I-495 South, the 495 South Express Lanes, and several 495 Express Lanes ramps.

“Drivers traveling on I-66 and I-495 during this time should expect delays and consider using alternate routes,” the Virginia Department of Transportation said in a news release. “Message boards across the region will direct drivers on I-95 and I-495 to use alternate routes those nights.”

Here are more details on the impending closures from VDOT:

I-495 South approaching I-66

  • Two lanes will be closed Friday (Oct. 8) from 10 p.m.-6 a.m., Saturday (Oct. 9) from 10 p.m.-7 a.m., and Sunday (Oct. 10) from 9 p.m.-5:30 a.m.
  • All lanes of I-495 South will be closed Friday and Saturday from midnight to 5 a.m., and Sunday from 11:30 p.m. to 4:30 a.m.

Ramp from I-66 West to I-495 South

  • The ramp will be closed Friday and Saturday nights from 10 p.m.-5 a.m., and Sunday night from 11:30 p.m.-4:30 a.m.
  • 495 Express Lanes and ramps will be closed from 10 p.m.-5 a.m. every night.

Traffic will be detoured onto I-66 West to the Nutley Street exit in Vienna before looping onto I-66 East back toward I-495 South.

Traffic from the I-495 South and I-66 interchange will be detoured to Nutley Street overnight on Oct. 8-10 (via VDOT)

VDOT notes that the construction work depends on the weather and could be rescheduled if there are inclement conditions.

This will be the third consecutive weekend of construction-related closures on I-495 after recent lane closures on the Beltway at the Dulles Toll Road interchange in Tysons for joint bridge work there.

This weekend’s beam installation is part of work on a new flyover ramp that will connect I-495 North to I-66 West, one of several changes coming to the interchange courtesy of the Transform 66 Outside the Beltway project to add toll lanes on I-66 from Dunn Loring to Gainesville.

According to VDOT, the reconfigured interchange will provide access to and from the 495 Express Lanes to the new I-66 Express Lanes, enable drivers to switch between express and general-purpose lanes when changing roadways, and replace existing noise walls while adding new ones on I-66 near Idylwood Park.

Work has been ongoing throughout the I-66 corridor since 2018. Just this past weekend, two new ramps from Nutley Street to I-66 West opened to traffic in Vienna. The express lanes are expected to open to traffic in December 2022.

Recent Stories

Beaver munching on grass by Walney Pond in Chantilly (staff photo by Angela Woolsey) Shake Shack proposed for Kamp Washington Shopping Center — “Fairfax City Board of Architectural Review approved…

A train at the McLean Metro station platform (file photo) The Fairfax County Board of Supervisors is asking the county’s General Assembly delegation to oppose Gov. Glenn Youngkin’s proposed funding…

8220 Crestwood Heights Drive (image via Google Maps) Fairfax County Fire and Rescue responded to a fire at a high-rise on the 8200 block of Crestwood Heights Drive in Tysons…

Morning Notes

Cat (staff photo by Vernon Miles) Cat declawing to be banned in Virginia — “Veterinarians will not be allowed to declaw cats in Virginia starting in July, unless there are certain…

×

Subscribe to our mailing list